Mini Shoring Drag Boxes
Hire mini drag boxes from GAP - these drag boxes provide a safe and quick means of pipe laying. Excavators are used to drag the box forward by pulling the front strut. Pinned struts allow for easy adjustment.
Technical Specification - pdf 245 KB
- Boots required
- Gloves required
- Hard hat required
- A simple to assemble, two-sided mechanical shield system
- Maximum trench depth: 3.9m
- Panel dimensions (LxH): 3m x 2m
- Extension height: 1m
- Panel thickness: 65mm
- Length between struts: 2.8m
- Two weeks minimum hire