Maxi Shoring Drag Boxes
Hire GAP's maxi drag boxes, which provide a safe and quick means of pipe laying. Excavators are used to drag the box forward by pulling on the front strut. Pinned struts allow for easy adjustment.
Technical Specification - pdf 245 KB
- Boots required
- Gloves required
- Hard hat required
- A simple to assemble, two-sided mechanical shield system
- Maximum trench depth: 2.9m
- Panel dimensions (LxH): 5m x 2m
- Extension height: 1m
- Panel thickness: 80mm
- Length between struts: 4.8m
- Two weeks minimum hire