Maxi Drag Boxes

Hire GAP's maxi drag boxes, which provide a safe and quick means of pipe laying. Excavators are used to drag the box forward by pulling on the front strut. Pinned struts allow for easy adjustment.

Technical Specification - pdf 245 KB
  • Boots required
  • Gloves required
  • Hard hat required
  • Maximum trench depth: 2.9m
  • Panel dimensions (LxH): 5m x 2m
  • Extension height: 1m
  • Panel thickness: 80mm
  • Length between struts: 4.8m
  • Two weeks minimum hire

Choose Product

Your Selection

Select specification above

Not sure what you're looking for? Contact us