arrow icon Back

AGR T Narrow 6.2m(P/H)x1.8m x850

AG068

Key Features

  • Quicker and simpler to build with fewer components
  • Less susceptible to loss and damage

The advance guardrail (AGR) system provides an alternative build method for erecting aluminium tower scaffolds, providing extra safety.

CAN'T FIND WHAT YOU'RE LOOKING FOR?

Full Description

The advance guardrail (AGR) system provides an alternative build method for erecting aluminium tower scaffolds, providing extra safety. The system has guardrail frame units which are installed during the erection process. No overreaching with a double deck on every level for safety. Guardrail in place before user ascends the platform. One week minimum hire.

Similar Products